Loading
Loading
Custom injection mold tooling and mass production for thermoplastic components. Multi-cavity molds for high-volume production with hot runner or cold runner systems. Covers commodity resins (PP, ABS, PA66) and engineering plastics (POM, PEEK, PC) with insert molding and overmolding capabilities.
1 mold (tooling) + 5,000 pcs
35-45 days (tooling) / 15 days (production)
China → India
DFM analysis and mold flow simulation before steel cutting. T1 sample approval with dimensional and cosmetic inspection. Mold ownership retained by client. Production units packed in inner bags + corrugated cartons on pallets. HS Code 8480.